Medium & Heavy Pipe Grade C250

Manufacturing Process

Grade C250 Pipe is manufactured for general mechanical and low-pressure reticulation applications using advanced cold-forming and high-frequency Electric Resistance Welding (ERW) technology. The cold-forming process improves pipe strength, hardness, and surface finish while maintaining precise dimensional tolerances for industrial performance.

Throughout production, each pipe undergoes non-destructive Eddy Current testing to ensure structural integrity, welding consistency, and compliance with international quality standards.

Galvanised Finish

Hot-dipped galvanized pipe is manufactured and tested in accordance with AS 4792 standards to provide long-term corrosion resistance and dependable field performance.

Key Specifications

  • Coating Mass: 300 g/m² minimum average on both sides
  • High adhesion galvanizing suitable for bending applications
  • Pipe can be bent to a radius of 6× the pipe diameter without coating failure
  • Available in red, black, and galvanized finishes

Standard Lengths

Available in sizes ranging from DN 20 to DN 150, MHP Grade C250 pipes are supplied in standard 6.5-meter lengths to support efficient transportation, handling, and on-site installation. Customers can choose from red oxide, black steel, or hot-dip galvanized finishes depending on project requirements and environmental conditions. The galvanized option provides enhanced corrosion resistance and long-term durability for demanding industrial and outdoor applications. Please note that DN refers to Nominal Diameter and replaces the traditional NB (Nominal Bore) designation used in earlier piping standards.

Scope Of Applications

Grade C250 pipes are commonly used across a wide range of industrial and commercial sectors requiring durable and dependable low-pressure piping systems.

Why Choose MHP Grade C250 Pipes?

Precision Manufacturing Produced using advanced ERW production lines for superior dimensional accuracy and consistency.Cold-forming technology increases hardness

send us a quote.

Standard turnaround on a project quotation is one working day

Scroll to Top